Find out what cookies we use and how to disable themThis document specifies a procedure to qualify a preliminary welding procedure specification (pWPS) by welding procedure tests to produce a qualified welding procedure specification (WPS).
NOTE 1 The application of this document ensures that the qualification of the pWPS is carried out according to a uniform test procedure.
NOTE 2 The primary purpose of welding procedure qualification is to demonstrate that the joining process proposed for construction is capable of producing joints having the required mechanical properties for the intended application.
This document applies to the following thermoplastic welding processes:
— hot gas welding: round nozzle, speed, wedge;
— extrusion welding;
— heated tool welding: butt, socket, wedge;
This document applies to the welding of the following products:
— sheet
— pipe (unreinforced, solid wall only);
— fittings (unreinforced only);
— lining membrane;
This document covers the welding of the following groups of materials:
a) for sheets, pipes and fittings:
— PVC (including all kinds of PVC-U, PVC-C) and ABS;
— PP;
— PE;
— PVDF;
— ECTFE, PFA and FEP;
b) for lining membranes:
— PVC-P;
— PE;
— ECB;
— PP;
c) for pipes and fittings only:
— PA-U 11 and PA-U 12.
Required form fields are indicated by an asterisk (*) character.
You are now following this standard. Weekly digest emails will be sent to update you on the following activities:
You can manage your follow preferences from your Account. Please check your mailbox junk folder if you don't receive the weekly email.
You have successfully unsubscribed from weekly updates for this standard.
Comment by: