If you have difficulty in submitting comments on draft standards you can use a commenting template and email it to admin.start@bsigroup.com. The commenting template can be found here.
This document provides principles for the installation, operation, and performance of reliable PW and WFI storage and distribution systems.
This document covers the following topics:
— distribution piping,
— storage tank(s) and accessories
— pump(s)
— heat exchangers(s)
— ozonation
— ultraviolet irradiation
— instruments
— piping & valves
— loop outlet valve
— point of use (POU),
— operating parameters,
— piping and accessories for the POU.
All distribution loops and sub-loops are included in the scope of this document.
This document does not cover the following topics:
— detailed specifications for the equipment design, construction, and inspection,
— detailed specifications for pipeline installation, slope measurement, cleaning, and passivation,
— detailed engineering design, commissioning, and operation of the PW and WFI system,
— inspection and Verification / Qualification / Validation requirements,
— pretreatment and purification systems that are used to generate PW and WFI (also refer to ISO 22519),
— hardware that will constitute the control system of a PW and WFI system.
Required form fields are indicated by an asterisk (*) character.
You are now following this standard. Weekly digest emails will be sent to update you on the following activities:
You can manage your follow preferences from your Account. Please check your mailbox junk folder if you don't receive the weekly email.
You have successfully unsubscribed from weekly updates for this standard.
Comment by: