If you have difficulty in submitting comments on draft standards you can use a commenting template and email it to admin.start@bsigroup.com. The commenting template can be found here.

Revision of BS 6644:2011 Specification for the installation and maintenance of gas-fired hot water boilers of rated inputs between 70 kW (net) and 1.8 MW (net) (2nd and 3rd family gases)

Source:
BSI
Committee:
GSE/30 - Gas installations (1st, 2nd and 3rd family gases)
Categories:
Information management | Standardization. General rules
Comment period start date:
Comment period end date:

Comment by:

Scope

Scope – There will be a minor change in scope to add reference to a new standard

This British Standard specifies requirements for the installation, including design, inspection, commissioning and maintenance, of gas-fired hot water boilers of net rated heat inputs exceeding 70 kW but not exceeding a net heat input of 1.8 MW. Groups of boilers with individual net heat inputs of 70 kW or less, but with aggregate net heat inputs in excess of 70 kW, are also covered.

This British Standard is applicable to the installation of boilers that are designed to utilize normally distributed gases of Group H of the second family (e.g. natural gas), and gases of Group P (e.g. propane) and Group B (e.g. butane) of the third family. For the purposes of this installation standard, LPG/air mixtures are regarded as third family gases.

This British Standard is applicable to the installation of the following gas-fired hot water boilers: 

a) boilers supplied as a complete assembly and conforming to BS EN 15502, BS EN 656 or BS 5978 (all parts);

b) boilers supplied as a complete assembly and used in multiple boiler installations where the total net heat input exceeds 70 kW and conforming to BS EN 297, BS EN 483 or BS EN 677;

c) boilers and burners delivered separately and assembled on site, comprising:

1) a boiler shell conforming to BS EN 303-1, BS EN 12952 (all parts), BS EN 12953 (all parts), BS 779, BS 855 or BS 2790;

2) a burner conforming to BS EN 676;

3) an assembly conforming to BS EN 303-3 or BS 5978-1 and BS 5978-3.

Purpose

The revision will focus on updating the standard to reflect developments since the 2011 edition and specifically the items below:

• Improving clarity where installers and users regularly seek guidance specifically on flue terminal positions, plume management and alignment with IGEM/UP/10 and BS EN 12828.

• A potential new section or annex covering modular boiler installations

• A potential new section on what technical competencies are required to work on gas fired equipment in scope.

• An updated section on the Clean Air Act

• Improving guidance around condensate drainage, ventilation, expansion vessels and safety valves.

• Updating the standard to reflect newer boiler types and standards, specifically BS EN 15502.

Comment on proposal

Required form fields are indicated by an asterisk (*) character.


Please email further comments to: admin.start@bsigroup.com

Follow standard

You are now following this standard. Weekly digest emails will be sent to update you on the following activities:

You can manage your follow preferences from your Account. Please check your mailbox junk folder if you don't receive the weekly email.

Unfollow standard

You have successfully unsubscribed from weekly updates for this standard.

Error