CEN/TC 198 N 354, Revision of EN 1034-16 2012 Safety of machinery - Safety requirements for the design and construction of paper making and CEN/TC 198 N 354 finishing machines - Part 16: Paper and board making machines

Scope

This European Standard applies to machines for the production of paper and board, including head box, wire section (former), press section, drying section, film size press, coating unit, flotation and infrared dryer, smoothing unit, integrated calender, measuring device, reel-up, integrated sheeter, drives and control system (paper and board making machines) and applies together with EN 1034-1:2000+A1:2010. It deals with all significant hazards, hazardous situations and hazard events relevant to machines for the production of paper and board, when used as intended and under the conditions foreseen by the manufacturer (see Clause 4). This document does not deal with pressure hazards in steam-heated drying cylinders.

NOTE Directive 97/23/EC gives essential safety requirements for equipment under pressure.

This document does not apply to:

- tissue making machines,

- cardboard making machines,

- coating machines,

- machines for the production of corrugated board,

- integrated conveyors and cranes designed for transporting reels/shells (reel spools) and for machine maintenance, and

- integrated fire extinguishing equipment.

This European Standard is not applicable to paper and board making machines which are manufactured before the date of publication of this European Standard by CEN.

Purpose

The result of the systematic review in 2018 showed that five members (AT, FI, DE, SE) are in favour to revise the standard. The necessity of adapting the contents to the state of the art is seen.

Due to delays in other projects of the responsible working group CEN/TC 198 WG2, it was not yet possible to start the project within the scheduled time frame (3 years) for the existing Preliminary Work Item. From the side of the experts, there is still the wish to start the projects in the near future. In consultation with the CCMC, it was decided to set up the PWI for this standard for a further three years.

Comment on proposal

Required form fields are indicated by an asterisk (*) character.


Please email further comments to: debbie.stead@bsigroup.com

Follow standard

You are now following this standard. Weekly digest emails will be sent to update you on the following activities:

You can manage your follow preferences from your Account. Please check your mailbox junk folder if you don't receive the weekly email.

Unfollow standard

You have successfully unsubscribed from weekly updates for this standard.

Error