If you have difficulty in submitting comments on draft standards you can use a commenting template and email it to admin.start@bsigroup.com. The commenting template can be found here.

We use cookies to give you the best experience and to help improve our website

Find out what cookies we use and how to disable them

BS EN IEC 62192-1 BS EN 62192-1 Ed.1.0 Rope for electrical work. Part 1: work within the live working zone or in contact with live parts

Source:
IEC
Committee:
PEL/78 - Tools for live working
Categories:
Electric shock protection. Live working | Power transmission and distribution lines | Electrical equipment. Special conditions. Other
Comment period start date:
Comment period end date:
Number of comments:
0

Comment by:

Scope

This document covers Category 1 insulating ropes that are utilized during Live Working (LW) procedures in contact with parts of installations operating at voltages up to and including 800 kV AC. They shall already meet other specifications relating to mechanical strength, physical and construction properties. Test acceptance criteria in this document are applicable for insulating ropes with a diameter of 35 mm or less. Insulating ropes with larger diameters may require increased leakage current criteria and engineering analysis for a particular application.

At the present time, insulating rope options include but are not limited to various styles, materials, and construction, including extruded thermoplastic jacket ropes with sealed ends and fibre with overlay/wax coating and additives. Informative Annex A provides guidance for testing ropes intended for use in rain conditions.

This document covers in-service care and periodic testing. The arc flash properties of the insulating rope are not evaluated in this document but should be given consideration.

An acceptance test may be arranged between a manufacturer and the end user in order to demonstrate that the product meets the specifications and requirements of this document.

The scope of this document does not presently include DC testing.

 

Read draft and comment

Comment on proposal

Required form fields are indicated by an asterisk (*) character.


Please email further comments to: debbie.stead@bsigroup.com

Follow standard

You are now following this standard. Weekly digest emails will be sent to update you on the following activities:

You can manage your follow preferences from your Account. Please check your mailbox junk folder if you don't receive the weekly email.

Unfollow standard

You have successfully unsubscribed from weekly updates for this standard.

Error