This document specifies standard rules for preparing, conducting, evaluating and reporting thermal performance tests on combined cycle and cogeneration power plants driven by gas turbines for base and part load operation with or without supplementary firing.
This document is applicable to
— thermal performance tests for general information,
— thermal acceptance tests for determining the performance of the combined cycle plant in relation to a contractual guarantee, and
— comparative tests designed to check the performance differentials of the combined cycle and cogeneration power plants, for testing before and after modifications, upgrades or overhauls.
It can be used to determine the following thermal performance test goals and expected values, under specific operating and reference conditions within defined test boundaries:
— electrical power output;
— heat rate or efficiency;
— process steam thermal efflux, hot water and/or district heating w/o generation of electrical power output by means of a steam turbine.
This document does not apply to individual equipment component testing, which is covered by corresponding standards.
It is not intended to be applied to the following test goals:
— environmental testing for example emissions, noise;
— vibration testing;
— operational testing;
— absolute or comparative performance of specific components of the combined cycle covered by dedicated standards (e.g. gas turbines).
Required form fields are indicated by an asterisk (*) character.
You are now following this standard. Weekly digest emails will be sent to update you on the following activities:
You can manage your follow preferences from your Account. Please check your mailbox junk folder if you don't receive the weekly email.
You have successfully unsubscribed from weekly updates for this standard.
Comment by: