We will be carrying out essential maintenance activity on this website on Monday 12th October between 0600 and 0900 UK time. You might experience some brief interruption or loss of some functionality. We apologise for any inconvenience this may cause.

BS EN IEC 61400-24 BS EN 61400-24 Ed.3.0 Wind energy generation systems. Part 24: Lightning protection

Source:
IEC
Committee:
PEL/88 - Wind turbines
Categories:
Wind turbine energy systems
Comment period start date:
Comment period end date:
Number of comments:
0

Comment by:

Scope

This part of IEC 61400 applies to lightning protection of all wind turbines (onshore and offshore) and wind power systems.

This standard covers the following aspects of the product lifecycle: design, validation and commissioning.

–        Requirements on the documentation to be provided by the OEM in regard to inspections, maintenance and monitoring are provided (normative −24),

–        Requirements are provided for operation and maintenance of foundation, tower and nacelle

–        For blade operational and maintenance requirements, refer to IEC 61400-32.

This document defines the lightning environment for wind turbines and exposure assessment for wind turbines in that environment. It defines requirements for protection of blades, other structural components and electrical and control systems against both direct and indirect effects of lightning. Validation requirements including testing, simulations and comparison with previous field experience are included.

Guidance on the use of applicable lightning protection, industrial electrical and EMC standards including earthing is provided.

Guidance regarding personal safety is provided.

Guidelines for lightning damage statistics and reporting are provided.

Normative references are made to generic standards for lightning protection, low-voltage systems and high-voltage systems for machinery and installations and electromagnetic compatibility (EMC).

Read draft and comment

Comment on proposal

Required form fields are indicated by an asterisk (*) character.


Please email further comments to: admin.start@bsigroup.com

Follow standard

You are now following this standard. Weekly digest emails will be sent to update you on the following activities:

You can manage your follow preferences from your Account. Please check your mailbox junk folder if you don't receive the weekly email.

Unfollow standard

You have successfully unsubscribed from weekly updates for this standard.

Error