If you have difficulty in submitting comments on draft standards you can use a commenting template and email it to admin.start@bsigroup.com. The commenting template can be found here.

BS EN 63112 Ed.2.0 Photovoltaic (PV) arrays - Earth fault protection equipment - Safety and safety-related functionality

Source:
IEC
Committee:
GEL/82 - Photovoltaic Energy Systems
Categories:
Solar energy engineering
Comment period start date:
Comment period end date:
Number of comments:
0

Comment by:

Scope

This document specifies safety requirements applicable to Photovoltaic Earth-Fault Protection Equipment (PV-EFPE) whose function is to detect, interrupt where applicable, and warn system operators of earth faults in solar photovoltaic array DC circuits with maximum open circuit system voltages up to 3 kV DC, where the PV-EFPE is fixed equipment in the PV installation.

For integrated PV-EFPE the host equipment performs some of the functionality of this document, and in some cases is controlled by the PV-EFPE.

NOTE Photovoltaic arrays can consist of a single PV module, a single PV string, several parallel-connected strings, or several parallel-connected PV sub-arrays and their associated electrical wiring and components, including DC-DC converters up to the terminals of the final power conversion equipment.

This document specifies:

– the types and levels of the monitoring and protection functions that may be provided;

– the nature and timing of responses to earth faults;

– test methods for validating the monitoring and protection functions provided;

– requirements for functional safety and fault tolerance; and

– requirements for product safety including construction, environmental suitability, markings, documentation, and testing.

NOTE This document does not specify the need for PV-EFPE for a given PV system, or the settings required for a particular site: that is typically covered by installation standards such as IEC 62548 and IEC 60364-7-712.

Read draft and comment

Comment on proposal

Required form fields are indicated by an asterisk (*) character.


Please email further comments to: admin.start@bsigroup.com

Follow standard

You are now following this standard. Weekly digest emails will be sent to update you on the following activities:

You can manage your follow preferences from your Account. Please check your mailbox junk folder if you don't receive the weekly email.

Unfollow standard

You have successfully unsubscribed from weekly updates for this standard.

Error