BS EN IEC 61285 ED4 BS EN 61285 ED4 Industrial-process control - Safety of analyser houses

Source:
IEC
Committee:
GEL/65/1 - Systems aspects
Categories:
Safety. Machinery | Industrial process measurement and control
Number of comments:
0

Scope

This International Standard describes the physical requirements for the safe operation of the process analyser measuring system installed in an analyser house (AH) in order to ensure its protection against fire, explosion and health hazards. This standard applies for analyser houses with inner and/or external potential explosive atmospheres and it applies to hazards caused by toxic substances or asphyxiant gases. (Refer to national guidelines on toxic hazards.)

This standard does not address facilities where solids (dust, powder, fibres) are the hazard.

This standard does not seek to address all functional safety issues related to analyser houses.

Clause 4 addresses the location of the AH and connection within the process plant areas.

Clause 5 addresses the design, construction and layout of the AH.

Clause 6 addresses measures for reducing the danger of explosion for AHs while permitting maintenance of equipment with the power on and the case open.

For most fluids, the major constraint is that the concentration of vapours, which are toxic for personnel, is lower than the lower explosive (flammable) limit (LFL) (see Clause 7).

Using n-Pentane as an example, the LFL is 1,5 % or 15 000 × 10–6 [Source OSHA], the level immediately dangerous to life or health (which is the maximum level from which a worker could escape within 30 min without any escape-impairing symptoms or any irreversible health effects) is only 0,1 % or 1 000 × 10–6.

Clause 7 addresses those measures for protecting personnel from materials in the atmosphere of AHs that are hazardous to health. 

Comment on proposal

Required form fields are indicated by an asterisk (*) character.


Please email further comments to: debbie.stead@bsigroup.com

Follow standard

You are now following this standard. Weekly digest emails will be sent to update you on the following activities:

You can manage your follow preferences from your Account. Please check your mailbox junk folder if you don't receive the weekly email.

Unfollow standard

You have successfully unsubscribed from weekly updates for this standard.

Error