This document provides general format for spacecraft and launch vehicle Combined Operation Plan (COP).
Note:
— An example of the COP based on a general format is provided in Annex A.
— In developing COP, following sections shall be included:
— 1. Scope
— 2. Normative references
— 3. Terms, definitions and abbreviated terms
— 4. General requirements
— 5. SC/PLA mating and fairing - encapsulation (operation plan at spacecraft processing facility)
— 6. Encapsulated-fairing mating to core vehicle
— 7. Operations at the Vehicle Assembly Building (VAB)
— 8. Final RF dress rehearsal
— Sections 4 to 8 are the minimum requirements in developing COP.
Required form fields are indicated by an asterisk (*) character.
You are now following this standard. Weekly digest emails will be sent to update you on the following activities:
You can manage your follow preferences from your Account. Please check your mailbox junk folder if you don't receive the weekly email.
You have successfully unsubscribed from weekly updates for this standard.
Comment by: