BS ISO 23817 ISO 23817 Ships and marine technology. Ballast water management systems (BWMS). Procedures for commissioning and testing BWMS using electrolytic methods

Source:
ISO
Committee:
SME/32 - Ships and marine technology - Steering committee
Categories:
Water. Industrial use
Comment period start date:
Comment period end date:
Number of comments:
0

Comment by:

Scope

This document provides guidance on procedures for commissioning a ballast water management system (BWMS) using electrolytic methods following installation on board a ship. It specifies safety measures, procedures for commissioning (including installation inspection, function test, training of ship's crew) and a commissioning test in accordance with BWM.2/Circ.70/Rev.1, as may be revised. This commissioning process ensures the health and safety of personnel involved in commissioning, verifies proper function and operation, and provides procedures for sampling and analysis. This document also provides guidance on the documentation of commissioning.

This document is mainly focused on the commissioning of a BWMS using electrolytic methods after initial installation on board a ship, but it can also apply to other necessary surveys of a BWMS and readiness evaluation of land-based or shipboard testing for type approval required by IMO and/or a port state.

NOTE A survey of the installed equipment and associated documentation will be conducted by a Recognized Organization (RO) in accordance with the BWMS Code (MEPC.300(72)), and the Harmonized System for Survey and Classification (HSSC).[22] Installation checkout and commissioning is normally completed by the manufacturer or their technical representative in accordance with manufacturer requirements, while verification of discharge samples is conducted by a ballast water testing organization.

Read draft and comment

Comment on proposal

Required form fields are indicated by an asterisk (*) character.


Please email further comments to: debbie.stead@bsigroup.com

Follow standard

You are now following this standard. Weekly digest emails will be sent to update you on the following activities:

You can manage your follow preferences from your Account. Please check your mailbox junk folder if you don't receive the weekly email.

Unfollow standard

You have successfully unsubscribed from weekly updates for this standard.

Error