We use cookies to give you the best experience and to help improve our website
Find out what cookies we use and how to disable themThis document cover heat pumps for space heating, domestic hot water production and alternate operation, where the same heat pump delivers the heat to cover the space heating and domestic hot water heat requirement.
The document provides a calculation method under steady conditions that corresponds to one calculation interval.
This calculation is intended to be connected to the whole building calculation model and takes in account the external conditions and building controls that influence the energy requirements for heating supplied by the heat pump system.
The scope of this standard is to standardize the:
— required inputs;
— calculation methods;
— required outputs;of the generation for space heating and domestic hot water production of the following heat pump systems:
— electrically-driven vapour compression cycle (VCC) heat pumps;
— combustion engine-driven vapour compression cycle heat pumps;
— thermally-driven vapour absorption cycle (VAC) heat pumps,using combinations of heat source and heat sink listed in Table 1.
Table 1
— Heating sources and sinksSource Sink Outdoor air Indoor air Exhaust-air Ducted air Indirect ground source with brine Technical water Indirect ground source with water Domestic hot water Direct ground source (DX, direct expansion) Surface water Ground water This document does not cover sizing or inspection of heat pumps.Heat pumps for cooling systems are taken into account in module M4–8. Other generation systems such as boilers are covered in other sub modules of part M3-8.Table 2 shows the relative position of this standard within the set of EPB standards in the context of the modular structure as set out in EN ISO 52000‑1.
NOTE 1 The same table can be found in CEN ISO/TR 52000‑2, with, for each module, the numbers of the relevant EPB standards and accompanying technical reports that are published or in preparation.NOTE 2 The modules represent EPB standards, although one EPB standard may cover more than one module and one module may be covered by more than one EPB standard, for instance a simplified and a detailed method respectively. See also Clause 2 and Tables A.1 and B.1.Table 2 — Position of this standard, within the modular structure of the set of EPB standardsOverarching Building (as such) Technical Building Systems Descriptions Descriptions Descriptions Heating Cooling Ventilation Humidification Dehumidification Domestic Hot water Lighting Building automation and control Electricity production sub M1 sub M2 sub M3 M4 M5 M6 M7 M8 M9 M10 M11 1 General 1 General 1 General 2 Common terms and definitions; symbols, units and subscripts 2 Building Energy Needs 2 Needs 3 Applications 3 (Free) Indoor Conditions without Systems 3 Maximum Load and Power 4 Ways to Express Energy Performance 4 Ways to Express Energy Performance 4 Ways to Express Energy Performance 5 Building Functions and Building Boundaries 5 Heat Transfer by Transmission 5 Emission and control 6 Building Occupancy and Operating Conditions 6 Heat Transfer by Infiltration and Ventilation 6 Distribution and control 7 Aggregation of Energy Services and Energy Carriers 7 Internal Heat Gains 7 Storage and control 8 Building Partitioning 8 Solar Heat Gains 8 Generation 8–1 Combustion boilers 8–2 Heat pumps 15316–4-2 15316–4-2 8–3 Thermal solar Photovoltaics 8–4 On-site cogeneration 8–5 District heating and cooling 8–7 Wind turbines 8–8 Radiant heating, stoves 9 Calculated Energy Performance 9 Building Dynamics (thermal mass) 9 Load dispatching and operating conditions 10 Measured Energy Performance 10 Measured Energy Performance 10 Measured Energy Performance 11 Inspection 11 Inspection 11 Inspection 12 Ways to Express Indoor Comfort 12 – 12 BMS 13 External Environment Conditions 14 Economic Calculation NOTE The shaded modules are not applicable.
You are now following this standard. Weekly digest emails will be sent to update you on the following activities:
You can manage your follow preferences from your Account. Please check your mailbox junk folder if you don't receive the weekly email.
You have successfully unsubscribed from weekly updates for this standard.
Comment on proposal
Required form fields are indicated by an asterisk (*) character.