Reference
|
Standards description
|
|
PD ISO/TS 22265
|
Quick Release Couplers Best Practices — Correct installation, use and maintenance suggested guidelines
Categories:
Unclassified documents
Drafting begins : 2025-07-22
|
Drafting
|
BS ISO 8434-3
|
Metallic tube connections for fluid power and general use —. Part 3: O-ring face seal connectors
Categories:
Piping and couplings
Drafting begins : 2023-06-06
|
Drafting
|
BS ISO 8434-2
|
Metallic tube connections for fluid power and general use — Part 2: 37 degree flared connectors
Categories:
Unclassified documents
Drafting begins : 2024-12-05
|
Drafting
|
BS ISO 6162-1
|
Hydraulic fluid power — Flange connections with split or one-piece flange clamps and metric or inch screws — Part 1: Flange connectors, ports and mounting surfaces for use at pressures of 3,5 MPa (35 bar) to 35 MPa (350 bar), DN 13 to DN 127
Categories:
Unclassified documents
Drafting begins : 2025-01-20
|
Drafting
|
BS ISO 18869
|
Hydraulic fluid power — Test methods for couplings actuated with or without tools
Categories:
Unclassified documents
Drafting begins : 2025-01-20
|
Drafting
|
BS ISO 16028
|
Hydraulic fluid power -- Flush-face type, quick-action couplings for use at pressures of 20 MPa (200 bar) to 31,5 MPa (315 bar) -- Specifications
Categories:
Piping and couplings
Drafting begins : 2016-11-28
|
Drafting
|
BS ISO 12151-1
|
Connections for hydraulic fluid power and general use — Hose fittings —. Part 1: Hose fittings with ISO 8434-3 O-ring face seal ends
Categories:
Hoses and hose assemblies | Piping and couplings
Drafting begins : 2022-08-16
|
Drafting
|
BS ISO 11926-1
|
Connections for general use and fluid power -- Ports and stud ends with ISO 725 threads and O-ring sealing. Part 1: Ports with O-ring seal in truncated housing
Categories:
Piping and couplings
Drafting begins : 2020-06-12
|
Drafting
|
BS EN ISO 9974-1
|
Connections for general use and fluid power -- Ports and stud ends with ISO 261 threads with elastomeric or metal-to-metal sealing. Part 1: Threaded ports
Categories:
Piping and couplings
Drafting begins : 2020-06-12
|
Drafting
|