If you have difficulty in submitting comments on draft standards you can use a commenting template and email it to admin.start@bsigroup.com. The commenting template can be found here.
Reciprocating internal combustion engines — Exhaust emission measurement — Part 5: Test fuels
Feedback closing date:
05/04/2026
Wind energy generation systems. Part 12-3: Power performance - Measurement based site calibration
Feedback closing date:
25/02/2026
Wind energy generation systems. Part 12-5: Power performance - Assessment of obstacles and terrain
Feedback closing date:
25/02/2026
Gas turbine combined cycle power plants — Thermal performance tests
Feedback closing date:
17/02/2026
Solid biofuels — Determination of content of heavy extraneous materials larger than 3,15 mm
Hydrogen technologies — Basic considerations for the safety of hydrogen systems